china Cost High Precision CNC Gear Rack with Quality Assurance for CNC Machine manufacturers

Solution Description

  

Production Description:
Design variety:  CHTGH-G5711
Precision quality:    (JIS Grade 2) 6h25
Materials:   (S45C Medium carbon metal) C45
Type:   Helical
Treatment method of teeth:   Ground
Hardness:   Heat treatment method: forty five-50 diploma
Sides floor:   Integrated
Force angle:   20 diploma

Item Benefit

 

one- CZPT backlash / higher precision.
2- CZPT and revolutionary successful meshing, always ensuring that much more than two equipment enamel are in make contact with with every single other, guaranteeing zero backlash on each sides of the equipment tooth, and making certain positioning precision of ± twenty microns, the place of each equipment tooth profile relative to the very first gear tooth All have been precisely calculated to make certain incredibly substantial positioning accuracy and remove amassed tooth pitch glitches.
three- CZPT -pace procedure capability,
4- The roller rack push system can attain high-velocity transmission with a speed of up to eleven meters for every CZPT . It can achieve high positioning accuracy that can only be supplied by linear motors. In addition, under large-velocity movement, the ultra-low friction design does not make heat or use areas.
five- Unrestricted stroke duration.

Connected Product

Module: Mod1, Mod1.5, Mod2, Mod3, Mod4, Mod5, Mod6, Mod8, Mod10
Precision: DIN5, DIN6, DIN7, DIN8,DIN9,DIN10
Content: S45C, 45#, C45, 40Cr, 304 stainless metal etc.
Heat treatment method: Quenched and tempered HRC20-25 Hardened HRC50-55

Manufacturing Approach

Packaging & CZPT

FAQ

Q:Could you acknowledge CZPT and CZPT ize?
A:Yes,we can CZPT ize for you in accordance to sample or drawing.

Q:Dose your manufacturing unit have any certificate?
A:of course.we have ISO 9001:2008 and CE. If you want other,we can do for you.

Q:IS you organization manufacturing unit or CZPT Organization?
A:We have CZPT own manufacturing unit our sort is manufacturing facility + trade.

Q: What is actually the supply time?
A:It typically requires about 7 working days,but the exact supply time may possibly be different for diverse get or at various time.

Q: How does your manufacturing facility do with regards to good quality control? 
A:Quality is precedence. We always attach wonderful value to quality management from the commencing to the conclude of the creation. CZPT y product will be fully assembled and carefully tested before packed .

Q: What’s your guarantee conditions? 
A:We offer you distinct guarantee phrases for distinct products. Remember to contact with us for particulars.

china  Cost Large Precision CNC Gear Rack with Quality Assurance for CNC Device producers